Meeting Agenda
1. Financial Report     
1.A. Financial Report
1.B. Approval of Payment of Claims (Attached separately as Extra)
1.C. Budget Revisions
1.D. Wire Transfers
1.E. Investment Transactions
1.F. WADM Projections
1.G. Fund Raisers
1.H. Investments in School Children  
2. Bids, R.F.P.s and Quotes Reports
2.A. Bids
2.A.1) PLACEHOLDER - Bid #1215 – Myers-Wilkins Elementary School Bid Package #1
2.A.2) PLACEHOLDER – Bid #1222 – Congdon Park Elementary – Bid package #1
2.A.3) PLACEHOLDER - for Bids Related to the LRFP
2.B. R.F.P.s
2.B.1) PLACEHOLDER – For RFPs Related to the LRFP
2.C. Quotes
2.C.1) PLACEHOLDER – For Quotes Related to the LRFP




3. Policies and Regulations
3.A. Policies
3.A.1) Policy 3187 - Use Policy for Internet Access
Attached are proposed revisions to Policy 3187 - Use Policy for Internet Access for the second reading.
3.A.2) Policy 3136/Regulation 3136 R - Suspension
Administration is requesting to suspend Policy 3136 - Travel In District, In State, and Out of State, to allow for the purchase of airfare outside the policy for students attending a HOSA Tournament.  This allows the purchase under a group discount.    
3.B. Regulations
4. Contracts, Change Orders, and Leases
4.A. Contracts
4.B. Change Orders
4.B.1) Eastern Middle School (Ordean East Middle School)
a.   Eastern MS LRFP – Concrete
Change Order #22, Bid #1165, WS #2 – Northland Concrete & Masonry Company, LLC
Change Order increase for additional floor infill in room 3401     Add:  $651.00
 
b.  Eastern MS LRFP – Concrete
Change Order #23, Bid #1165, WS #2 – Northland Concrete & Masonry Company, LLC
Change Order increase for locker bases for hallway lockers and a new sidewalk at the fence gate     
Add:  $10,228.00
 
c.   Eastern MS LRFP – Masonry
Change Order #27, Bid #1165, WS #5 – Harbor City Masonry, Inc.
Change Order increase to replace the metal stud door infill with CMU     Add:  $589.00
 
d.   Eastern MS LRFP – Masonry
Change Order #28, Bid #1165, WS #5 – Harbor City Masonry, Inc.
Change Order increase to add lintels in the attic space     Add:  $996.00
 
e.    Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #12, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide angles for opening 1113 and 1114 cut into the existing masonry wall
  Add:  $590.00
 
f.   Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #13, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide a longer lintel due to a wider opening     Add:  $705.00
 
g.   Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #14, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide rail at the pool equipment room     Add:  $382.00
 
h.   Eastern MS LRFP – Structural and Miscellaneous Metals
Change Order #8, Bid #1165, WS #6 – Northern Industrial Erectors, Inc.
Change Order increase to infill the floor openings at the abandoned stairs     Add:  $2,054.00
 
i.   Eastern MS LRFP – Structural and Miscellaneous Metals
Change Order #9, Bid #1165, WS #6 – Northern Industrial Erectors, Inc.
Change Order increase to slot holes in the beams in the vent chamber and modify the gusset     Add:  $1,373.00
 
j.    Eastern MS LRFP – Carpentry Materials and installation
Change Order #18, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the wood floor to prep for the shower and add wood blocking for the door infill     Add:  $600.00
 
k.   Eastern MS LRFP – Carpentry Materials and installation
Change Order #19, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the chase not shown on the drawings     Add:  $272.00 
4.B.2) Denfeld High School
a.   Denfeld HS LRFP – Resilient Flooring/Carpet
Change Order #6, Bid #1193, BP #4 (Contract #0965) – MCI, Inc dba Multiple Concepts Interiors
Change Order decrease to credit the base installation at rooms 1128, 1132, 1147 and 1149     Deduct:  $198.00
4.B.3) PLACEHOLDER - for Change Orders Related to the LRFP
4.C. Leases
5. Resolutions
5.A. Resolution B-6-12-3028 - Financial Institution Account Line of Credit
5.B. Resolution B-6-12-2029 - Resolution to Amend JOBZ Zone
5.C. Resolution #B-6-12-3033 – Resolution Authorizing the Purchase of Real Property from Christ Lutheran Church
5.D. Resolution #B-6-12-3034 – Resolution Authorizing the Application for Conveyance and Purchase of Tax Forfeited Land near Homecroft School
5.E. PLACEHOLDER - Resolution B-6-12-3016 - Resolution Authorizing The Execution And Delivery Of An Amendment To Installment Purchase Contract And A Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $12,801,327 Full Term Capital Appreciation Certificates Of Participation, Series 2012A
5.F. PLACEHOLDER - Resolution B-6-12-3017 - Resolution Authorizing The Execution And Delivery Of An Amendment To Lease Purchase Agreement And Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $6,340,000 Certificates Of Participation, Series 2012B
The final version of this resolution will be presented at the Board meeting.
5.G. Resolution B-6-12-3030 - Adoption of the FY13 Budget
5.H. PLACEHOLDER - Resolutions authorizing the purchase of properties relating to the Long-range Facilities Plan and relocation expenses that apply to these properties
5.I. PLACEHOLDER - Resolutions authorizing the sale of properties relating to the Long-range Facilities Plan and relocation expenses that apply to these properties
5.J. PLACEHOLDER - Resolutions for Schematic Designs and Working Drawings related to the LRFP
6. Informational
6.A. Expenditure Contracts
The Superintendent or the Director of Business Services has signed the following expenditure contracts during the month of May 2012
6.B. Revenue Contracts
The Superintendent or the Director of Business Services has signed the following revenue contracts during the month of May 2012
6.C. Other Contracts
The Superintendent or the Director of Business Services has signed the following no cost contracts during the month of May 2012
6.D. Facilities Management & Capital Project Status Report
6.E. Johnson Controls, Inc. Long-Range Facilities Plan Status Report
6.F. Change Orders Relating to the Long Range Facilities Plan
6.G. Contracts Signed in Relation to the Long Range Facilities Plan
7. Future Items
7.A. Property, Liability, Auto, Workers Compensation Insurance Renewal
Agenda Item Details Reload Your Meeting
Meeting: June 19, 2012 at 6:30 PM - Business Committee - Regular School Board Meeting
Subject:
1. Financial Report     
Description:
Recommendation:  It is recommended that the Duluth School Board approve the Financial Report as presented.
Subject:
1.A. Financial Report
Attachments:
Subject:
1.B. Approval of Payment of Claims (Attached separately as Extra)
Description:
This item is attached as an "extra" on BoardBook.
Subject:
1.C. Budget Revisions
Attachments:
Subject:
1.D. Wire Transfers
Attachments:
Subject:
1.E. Investment Transactions
Attachments:
Subject:
1.F. WADM Projections
Attachments:
Subject:
1.G. Fund Raisers
Attachments:
Subject:
1.H. Investments in School Children  
Attachments:
Subject:
2. Bids, R.F.P.s and Quotes Reports
Subject:
2.A. Bids
Subject:
2.A.1) PLACEHOLDER - Bid #1215 – Myers-Wilkins Elementary School Bid Package #1
Description:

Recommendation:  It is recommended that the Duluth School Board approve
Subject:
2.A.2) PLACEHOLDER – Bid #1222 – Congdon Park Elementary – Bid package #1
Description:

Recommendation:  It is recommended that the Duluth School Board approve
Subject:
2.A.3) PLACEHOLDER - for Bids Related to the LRFP
Subject:
2.B. R.F.P.s
Subject:
2.B.1) PLACEHOLDER – For RFPs Related to the LRFP
Subject:
2.C. Quotes
Subject:
2.C.1) PLACEHOLDER – For Quotes Related to the LRFP




Subject:
3. Policies and Regulations
Subject:
3.A. Policies
Subject:
3.A.1) Policy 3187 - Use Policy for Internet Access
Attached are proposed revisions to Policy 3187 - Use Policy for Internet Access for the second reading.
Description:

Recommendation:  It is recommended that the Duluth School Board approve the proposed revisions to Policy 3187 - Use Policy for Internet Access for the second reading.
Attachments:
Subject:
3.A.2) Policy 3136/Regulation 3136 R - Suspension
Administration is requesting to suspend Policy 3136 - Travel In District, In State, and Out of State, to allow for the purchase of airfare outside the policy for students attending a HOSA Tournament.  This allows the purchase under a group discount.    
Description:

Recommendation:  It is recommended that the Duluth School Board suspend Policy 3136 - to allow for the purchase of the airfare.
Attachments:
Subject:
3.B. Regulations
Subject:
4. Contracts, Change Orders, and Leases
Subject:
4.A. Contracts
Subject:
4.B. Change Orders
Subject:
4.B.1) Eastern Middle School (Ordean East Middle School)
a.   Eastern MS LRFP – Concrete
Change Order #22, Bid #1165, WS #2 – Northland Concrete & Masonry Company, LLC
Change Order increase for additional floor infill in room 3401     Add:  $651.00
 
b.  Eastern MS LRFP – Concrete
Change Order #23, Bid #1165, WS #2 – Northland Concrete & Masonry Company, LLC
Change Order increase for locker bases for hallway lockers and a new sidewalk at the fence gate     
Add:  $10,228.00
 
c.   Eastern MS LRFP – Masonry
Change Order #27, Bid #1165, WS #5 – Harbor City Masonry, Inc.
Change Order increase to replace the metal stud door infill with CMU     Add:  $589.00
 
d.   Eastern MS LRFP – Masonry
Change Order #28, Bid #1165, WS #5 – Harbor City Masonry, Inc.
Change Order increase to add lintels in the attic space     Add:  $996.00
 
e.    Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #12, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide angles for opening 1113 and 1114 cut into the existing masonry wall
  Add:  $590.00
 
f.   Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #13, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide a longer lintel due to a wider opening     Add:  $705.00
 
g.   Eastern MS LRFP – Structural Steel/Metal Fabrication - Supply
Change Order #14, Bid #1165, WS #5 – Duluth Steel Fabricators, Inc.
Change Order increase to provide rail at the pool equipment room     Add:  $382.00
 
h.   Eastern MS LRFP – Structural and Miscellaneous Metals
Change Order #8, Bid #1165, WS #6 – Northern Industrial Erectors, Inc.
Change Order increase to infill the floor openings at the abandoned stairs     Add:  $2,054.00
 
i.   Eastern MS LRFP – Structural and Miscellaneous Metals
Change Order #9, Bid #1165, WS #6 – Northern Industrial Erectors, Inc.
Change Order increase to slot holes in the beams in the vent chamber and modify the gusset     Add:  $1,373.00
 
j.    Eastern MS LRFP – Carpentry Materials and installation
Change Order #18, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the wood floor to prep for the shower and add wood blocking for the door infill     Add:  $600.00
 
k.   Eastern MS LRFP – Carpentry Materials and installation
Change Order #19, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the chase not shown on the drawings     Add:  $272.00 
Description:
l.   Eastern MS LRFP – Carpentry Materials and installation
Change Order #20, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the walls and add a door for the new ship’s ladder access     Add:  $1,382.00

m.  Eastern MS LRFP – Carpentry Materials and installation
Change Order #21, Bid #1165, WS #7 – Lipe Brothers Construction, Inc.
Change Order increase to demo the temporary carpet and add wood blocking for the band room windows     Add:  $1,948.00
 
n.   Eastern MS LRFP – Joint Sealers
Change Order #3, Bid #1165, WS #12 – Carciofini Company
Change Order increase to add caulking for the smoke barrier per City Code     Add:  $3,769.00
 
o.   Eastern MS LRFP – Drywall and Plaster
Change Order #12, Bid #1165, WS #16 – RTL Construction, Inc
Change Order increase to infill door 455 and credit window infill in room 3132       Add:  $241.00
 
p.  Eastern MS LRFP – Drywall and Plaster
Change Order #13, Bid #1165, WS #16 – RTL Construction, Inc
Change Order increase for additional sheetrock and framing in the old choir room, to furr out over existing walls, for new walls to keep conduit out of stairwell walls and to sheetrock over the existing window        Add:  $15,389.00
 
q.  Eastern MS LRFP – Carpet/Resilient Flooring
Change Order #6, Bid #1165, WS #19 – MCI, Inc dba Multiple Concepts Interiors
Change Order decrease to delete the VCT in room 3218           Deduct:  $60.00
 
r.  Eastern MS LRFP – Carpet/Resilient Flooring
Change Order #7, Bid #1165, WS #19 – MCI, Inc dba Multiple Concepts Interiors
Change Order decrease to delete the VCT in room 3130     Deduct:  $509.00
 
s.   Eastern MS LRFP – Chain Link Fence and Gates
Change Order #1, Bid #1165, WS #34 – Century Fence Company
Change Order increase to provide two person doors with panic devices for emergency exit at the fire lane       Add:  $6,676.00
 
Recommendation:  It is recommended the School Board approve the change orders as listed above at Eastern Middle School (Ordean East Middle School) reflecting a total increase of $47,276.00.
Attachments:
Subject:
4.B.2) Denfeld High School
a.   Denfeld HS LRFP – Resilient Flooring/Carpet
Change Order #6, Bid #1193, BP #4 (Contract #0965) – MCI, Inc dba Multiple Concepts Interiors
Change Order decrease to credit the base installation at rooms 1128, 1132, 1147 and 1149     Deduct:  $198.00
Description:

Recommendation:  It is recommended the School Board approve the change orders as listed above at Denfeld High School reflecting a total decrease of $198.00.
Attachments:
Subject:
4.B.3) PLACEHOLDER - for Change Orders Related to the LRFP
Subject:
4.C. Leases
Subject:
5. Resolutions
Subject:
5.A. Resolution B-6-12-3028 - Financial Institution Account Line of Credit
Description:

Recommendation:  It is recommended that the Duluth School Board approve Resolution B-6-12-3028 - Financial Institution Account Line of Credit.
Attachments:
Subject:
5.B. Resolution B-6-12-2029 - Resolution to Amend JOBZ Zone
Description:

Recommendation:  It is recommended the School Board approve Resolution B-6-12-3029 - Resolution to Amend JOBZ  Zone.
Attachments:
Subject:
5.C. Resolution #B-6-12-3033 – Resolution Authorizing the Purchase of Real Property from Christ Lutheran Church
Description:

Recommendation:  It is recommended the Duluth School Board approve Resolution #B-6-12-3033 – Resolution Authorizing the Purchase of Real Property from Christ Lutheran Church
Attachments:
Subject:
5.D. Resolution #B-6-12-3034 – Resolution Authorizing the Application for Conveyance and Purchase of Tax Forfeited Land near Homecroft School
Description:

Recommendation:  It is recommended the Duluth School Board approve Resolution #B-6-12-3034 – Resolution Authorizing the Application for Conveyance and Purchase of Tax Forfeited land near Homecroft School
Attachments:
Subject:
5.E. PLACEHOLDER - Resolution B-6-12-3016 - Resolution Authorizing The Execution And Delivery Of An Amendment To Installment Purchase Contract And A Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $12,801,327 Full Term Capital Appreciation Certificates Of Participation, Series 2012A
Description:

Recommendation:  It is recommended that the Duluth School Board approve Resolution B-6-12-3016 - Resolution Authorizing The Execution And Delivery Of An Amendment To Installment Purchase Contract And A Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $12,801,327 Full Term Capital Appreciation Certificates Of Participation, Series 2012A
Attachments:
Subject:
5.F. PLACEHOLDER - Resolution B-6-12-3017 - Resolution Authorizing The Execution And Delivery Of An Amendment To Lease Purchase Agreement And Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $6,340,000 Certificates Of Participation, Series 2012B
The final version of this resolution will be presented at the Board meeting.
Description:

Recommendation:  It is recommended that the Duluth School Board approve Resolution B-6-12-3017 - Authorizing The Execution And Delivery Of An Amendment To Lease Purchase Agreement And Supplement To Declaration Of Trust And Approving The Issuance, Sale And Delivery Of $6,340,000
Certificates Of Participation, Series 2012B
Attachments:
Subject:
5.G. Resolution B-6-12-3030 - Adoption of the FY13 Budget
Description:

Recommendation:  It is recommended that the Duluth School Board approve Resolution B-6-12-3030 - Adoption of the FY13 Budget.
Attachments:
Subject:
5.H. PLACEHOLDER - Resolutions authorizing the purchase of properties relating to the Long-range Facilities Plan and relocation expenses that apply to these properties
Subject:
5.I. PLACEHOLDER - Resolutions authorizing the sale of properties relating to the Long-range Facilities Plan and relocation expenses that apply to these properties
Subject:
5.J. PLACEHOLDER - Resolutions for Schematic Designs and Working Drawings related to the LRFP
Subject:
6. Informational
Description:
The items listed below are informational only and do not require board action.
Subject:
6.A. Expenditure Contracts
The Superintendent or the Director of Business Services has signed the following expenditure contracts during the month of May 2012
Attachments:
Subject:
6.B. Revenue Contracts
The Superintendent or the Director of Business Services has signed the following revenue contracts during the month of May 2012
Attachments:
Subject:
6.C. Other Contracts
The Superintendent or the Director of Business Services has signed the following no cost contracts during the month of May 2012
Attachments:
Subject:
6.D. Facilities Management & Capital Project Status Report
Description:
Kerry Leider will be in attendance to answer questions regarding the enclosed report.
Attachments:
Subject:
6.E. Johnson Controls, Inc. Long-Range Facilities Plan Status Report
Attachments:
Subject:
6.F. Change Orders Relating to the Long Range Facilities Plan
Description:
Kerry Leider will be in attendance to answer questions regarding the enclosed report.
Attachments:
Subject:
6.G. Contracts Signed in Relation to the Long Range Facilities Plan
Description:
Kerry Leider will be in attendance to answer questions regarding the enclosed report.
Attachments:
Subject:
7. Future Items
Subject:
7.A. Property, Liability, Auto, Workers Compensation Insurance Renewal