Meeting Agenda
I. Call Meeting to Order and Establish Quorum
II. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
III. Discussion and Possible Action
III.1. Veterans Memorial High School (VMHS) Tennis Court Lights and Canopy Project–Chanin Engineering
III.1.a. Status Report
III.1.b. Consideration and Approval of CO #01"Credit" to Omit Painting for the Galvanized Steel for the VMHS Tennis Court Lights and Canopy Project
III.2. North Side Swimming Pool Project - C.T. Brannon Engineering
III.2.a. Status Report
III.2.b. Consideration and Approval of CO #01 to "Credit" for the 25 Yard/Meter Lane Line for the North Side Swimming Pool Project
III.3. Mission High School (MHS) Phase III Renovation Project–PBK Architects
III.3.a. Status Report
III.3.b. Consideration and Approval of CPR #66 for Elevation Change at the North West Corner of the Cafeteria for the MHS Phase III
Renovation Project
III.3.c. Consideration and Approval of CPR #69 for the Enclosure Switch Board at the Mechanical Yard for the MHS Phase III Renovation Project
III.3.d. Consideration and Approval of CPR #70 Due to Revision on Civil Utility Design at the Band Hall Area for the MHS Phase III Renovation Project
III.3.e. Consideration and Approval of CPR #71 Conflicting Manhole Work on 15th Street for the MHS Phase III Renovation Project
III.3.f. Consideration and Approval of CPR #72 to Fur-Out Steel Columns Inside South Lobby for the MHS Phase III Renovation Project

III.3.g. Consideration and Approval of CO#03 for "Credit" Commissioning HVAC and Lighting Control System for the MHS Phase III
Renovation Project
III.4. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc.
III.4.a. Status Report
III.4.b. Consideration and Approval of CPR #12R3 for Additional Power for the Tom Landry Stadium Renovations Project
III.4.c. Consideration and Approval of CPR #12R5 for Additional Cabling for Track Timing System for the Tom Landry Stadium Renovations Project
III.4.d. Consideration and Approval of CPR #17 to "Credit" Two (2) Wireless Access Points, Shortel Phone and Video Server for the Tom Landry Stadium Renovations Project
III.4.e. Consideration and Approval of CPR #18 to "Credit" Fire Alarm and Intrusion Systems for the Tom Landry Stadium Renovations Project
III.4.f. Consideration and Approval of CPR #25 to Relocate Cross-Bracing at Concession Stands for the Tom Landry Stadium Renovations Project
III.4.g. Consideration and Approval of CPR #26 to Remove and Replace Concrete from the Ramps for the Tom Landry Stadium Renovations Project
III.4.h. Consideration and Approval of CPR #27 to Add IDF Rack, Quad Receptacles and Data Drops on the Visitor’s Side Bleachers for the Tom Landry Stadium Renovations Project
III.4.i. Consideration and Approval of CPR #29 for Additional Eleven (11) Delay Days for the Tom Landry Stadium Renovations Project
III.5. Mission Junior High School (MJHS) Science Building Chiller Project –
Halff Associates
III.5.a. Status Report
III.5.b. Consideration and Approval of CO#01 to "Credit" for Commissioning Services for the MJHS Science Building Chiller Project
III.6. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
III.7. Consideration and Approval for the Assignment of Geo-Technical and Material Testing Services for the Caliche Pad for the Transportation North Hub Project, for the Fencing at Tom Landry Stadium and Leo Najo Baseball Park Project and for the Track and Field Event Facilities for MJHS, Alton Memorial High School (AMJH), R. Cantu Junior High School (RCJHS) and K. White Junior High School (KWJHS)
IV. Informational: Operations Division
IV.1. Child Nutrition Program Department
IV.1.a. Update: On "Left-over Food"
IV.1.b. Update: How Students are Eating better with New Cycle of PE First then Lunch
IV.1.c. Update: Pending Audit
IV.2. Maintenance Department
IV.2.a. Pest Control Process
IV.3. Operations Division Supporting Childhood Cancer Awareness Month
IV.4. "Going Green" In November
V. Adjournment
Agenda Item Details Reload Your Meeting
Meeting: October 4, 2017 at 6:30 PM - Facilities Committee
Subject:
I. Call Meeting to Order and Establish Quorum
Subject:
II. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
Subject:
III. Discussion and Possible Action
Subject:
III.1. Veterans Memorial High School (VMHS) Tennis Court Lights and Canopy Project–Chanin Engineering
Subject:
III.1.a. Status Report
Subject:
III.1.b. Consideration and Approval of CO #01"Credit" to Omit Painting for the Galvanized Steel for the VMHS Tennis Court Lights and Canopy Project
Subject:
III.2. North Side Swimming Pool Project - C.T. Brannon Engineering
Subject:
III.2.a. Status Report
Subject:
III.2.b. Consideration and Approval of CO #01 to "Credit" for the 25 Yard/Meter Lane Line for the North Side Swimming Pool Project
Subject:
III.3. Mission High School (MHS) Phase III Renovation Project–PBK Architects
Subject:
III.3.a. Status Report
Subject:
III.3.b. Consideration and Approval of CPR #66 for Elevation Change at the North West Corner of the Cafeteria for the MHS Phase III
Renovation Project
Subject:
III.3.c. Consideration and Approval of CPR #69 for the Enclosure Switch Board at the Mechanical Yard for the MHS Phase III Renovation Project
Subject:
III.3.d. Consideration and Approval of CPR #70 Due to Revision on Civil Utility Design at the Band Hall Area for the MHS Phase III Renovation Project
Subject:
III.3.e. Consideration and Approval of CPR #71 Conflicting Manhole Work on 15th Street for the MHS Phase III Renovation Project
Subject:
III.3.f. Consideration and Approval of CPR #72 to Fur-Out Steel Columns Inside South Lobby for the MHS Phase III Renovation Project

Subject:
III.3.g. Consideration and Approval of CO#03 for "Credit" Commissioning HVAC and Lighting Control System for the MHS Phase III
Renovation Project
Subject:
III.4. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc.
Subject:
III.4.a. Status Report
Subject:
III.4.b. Consideration and Approval of CPR #12R3 for Additional Power for the Tom Landry Stadium Renovations Project
Subject:
III.4.c. Consideration and Approval of CPR #12R5 for Additional Cabling for Track Timing System for the Tom Landry Stadium Renovations Project
Subject:
III.4.d. Consideration and Approval of CPR #17 to "Credit" Two (2) Wireless Access Points, Shortel Phone and Video Server for the Tom Landry Stadium Renovations Project
Subject:
III.4.e. Consideration and Approval of CPR #18 to "Credit" Fire Alarm and Intrusion Systems for the Tom Landry Stadium Renovations Project
Subject:
III.4.f. Consideration and Approval of CPR #25 to Relocate Cross-Bracing at Concession Stands for the Tom Landry Stadium Renovations Project
Subject:
III.4.g. Consideration and Approval of CPR #26 to Remove and Replace Concrete from the Ramps for the Tom Landry Stadium Renovations Project
Subject:
III.4.h. Consideration and Approval of CPR #27 to Add IDF Rack, Quad Receptacles and Data Drops on the Visitor’s Side Bleachers for the Tom Landry Stadium Renovations Project
Subject:
III.4.i. Consideration and Approval of CPR #29 for Additional Eleven (11) Delay Days for the Tom Landry Stadium Renovations Project
Subject:
III.5. Mission Junior High School (MJHS) Science Building Chiller Project –
Halff Associates
Subject:
III.5.a. Status Report
Subject:
III.5.b. Consideration and Approval of CO#01 to "Credit" for Commissioning Services for the MJHS Science Building Chiller Project
Subject:
III.6. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
Subject:
III.7. Consideration and Approval for the Assignment of Geo-Technical and Material Testing Services for the Caliche Pad for the Transportation North Hub Project, for the Fencing at Tom Landry Stadium and Leo Najo Baseball Park Project and for the Track and Field Event Facilities for MJHS, Alton Memorial High School (AMJH), R. Cantu Junior High School (RCJHS) and K. White Junior High School (KWJHS)
Subject:
IV. Informational: Operations Division
Subject:
IV.1. Child Nutrition Program Department
Subject:
IV.1.a. Update: On "Left-over Food"
Subject:
IV.1.b. Update: How Students are Eating better with New Cycle of PE First then Lunch
Subject:
IV.1.c. Update: Pending Audit
Subject:
IV.2. Maintenance Department
Subject:
IV.2.a. Pest Control Process
Subject:
IV.3. Operations Division Supporting Childhood Cancer Awareness Month
Subject:
IV.4. "Going Green" In November
Subject:
V. Adjournment