skip to main content
Meeting Agenda
1. CALL TO ORDER/QUORUM
2. PLEDGE OF ALLEGIANCE
3. INVOCATION
4. ROTATION OF OFFICERS FOR CY 2017

            PRESIDENT                 ROBERT J. KNESAL
            VICE-PRESIDENT       JAMES C. SIMPSON, JR.
            SECRETARY               JOHN RESTER
            TREASURER               JACK NORRIS
            COMMISSIONER         E.J. ROBERTS
5. PUBLIC COMMENTS
6. APPROVAL OF MINUTES
7. APPROVAL OF TRAVEL
8. FINANCIAL REPORT - DEEDEE WOOD
8.A. DISBURSEMENTS
8.B. LICENSES
8.C. PROGRESS PAYMENTS
8.C.1. BALCH & BINGHAM,LLP/14-FD-08
8.C.2. BROWN, MITCHELL & ALEXANDER, INC./13-EN-02
8.C.3. DOLEAC ELECTRIC CO., INC/15-EN-08
8.C.4. G.A. WEST & CO., INC./15-EN-03
8.C.5. MATTHEWS MARINE, INC./16-EN-04
8.C.6. QES, INC./13-EN-03
8.C.7. W.C. FORE TRUCKING, INC./15-EN-04
8.C.8. YATES ANDERSON JOINT VENTURE/14-EN-07
8.C.9. ZPMC/15-EN-07
8.D. REQUESTS FOR CASH
8.D.1. AUTHORIZATION TO RENUMBER PREVIOUSLY APPROVED REQUEST FOR CASH ITEMS:

       ORIGINAL RFC #152 TO RFC #159 (APPROVED 9/22/16)
       ORIGINAL RFC #153 TO RFC #152 (APPROVED 11/9/16)
       ORIGINAL RFC #154 TO RFC #153 (APPROVED 11/9/16)
       ORIGINAL RFC #155 TO RFC #154 (APPROVED 11/9/16)
8.D.2. RESTORATION AGREEMENT RFC #155
8.D.3. RESTORATION AGREEMENT RFC #156
8.D.4. RESTORATION AGREEMENT RFC #157
8.D.5. RESTORATION AGREEMENT RFC #158
8.E. FOR SEPARATE APPROVAL (FROM RFC#157):
9. OLD BUSINESS
9.A. (MW)  APPROVAL OF TERMINAL OPERATING AGREEMENT AND SPACE ASSIGNMENT WITH CROWLEY LINER SERVICES, INC.
9.B. (JW)  APPROVAL OF MODIFICATION NO. 5 TO TASK ASSIGNMENT NO. 1 UNDER CONTRACT NO. 13-EN-02 WITH BROWN MITCHELL AND ALEXANDER
9.C. (JW)  AUTHORIZATION TO AWARD THE DEMOLITION OF CHEMOURS STEEL SILO PACKAGE
9.D. (JW)  APPROVAL OF CHANGE ORDER NO. 1 TO CONTRACT NO. 16-EN-04 WITH MATTHEWS MARINE, INC.
9.E. (JW)  APPROVAL OF A NOTICE OF COMPLETION FOR CONTRACT NO. 16-EN-04 WITH MATTHEWS MARINE, INC. 
9.F. (JW)  APPROVAL OF CONTRACT MODIFICATION NO. 3 TO CONTRACT NO. 14-EN-07 WITH YATES ANDERSON JOINT VENTURE
9.G. (JW)  APPROVAL OF CONTRACT MODIFICATION NO. 1 TO CONTRACT NO. 15-EN-01 WITH PRISM SYSTEMS, INC.
9.H. (NF)  APPROVAL OF AMENDMENT NO. 8 TO TASK ORDER NO. 22 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
9.I. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 44 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
9.J. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 45 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
9.K. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 13 WITH VOLKERT, INC. UNDER CONTRACT NO. 010-HUD-007
9.L. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 14 WITH VOLKERT, INC. UNDER CONTRACT NO. 010-HUD-007
9.M. (JW)  APPROVAL OF AMENDMENT NO. 3 TO TASK ORDER NO. 13 WITH QEA, LLC. UNDER CONTRACT NO. 010-HUD-011
9.N. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 8 WITH CDM SMITH UNDER CONTRACT NO. 010-HUD-012
9.O. (NF)  APPROVAL OF AMENDMENTS THAT NEED AN EXTENSION OF TIME IN ORDER TO CLOSEOUT PROJECTS:

        #010-HUD-001 - NEEL SCHAFFER - AMENDMENT 4 TO TASK ORDER 30
                                    90 DAYS - CONSTRUCTION SERVICES FOR CRANE PROJECT
        
        #010-HUD-001 - NEEL SCHAFFER -  AMENDMENT 4 TO TASK ORDER 33
                                   164 DAYS - TERMINAL 3 M&R FACILITY ACTIVITIES

        #010-HUD-001 - NEEL SCHAFFER AMENDMENT 1 TO TASK ORDER 40 
                                   60 DAYS - TRUCK SCALE PROJECT @ GATE

        #010-HUD-013 - ATWELL & GENT - AMENDMENT 7 TO TASK ORDER 8
                                    181 DAYS - ELECTRICAL WORK IN PHASE 1
9.P. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 12 WITH ATWELL & GENT UNDER CONTRACT NO. 010-HUD-013
9.Q. (NF)  APPROVAL OF CHANGE ORDER NO. 15 WITH L&A CONTRACTING UNDER CONTRACT NO. 013-HUD-018
9.R. (NF)  APPROVAL OF CHANGE ORDER NO. 4 WITH NECAISE BROTHERS UNDER CONTRACT NO. 016-HUD-033
9.S. (NF)  APPROVAL OF CHANGE ORDER NO. 5 WITH NECAISE BROTHERS UNDER CONTRACT NO. 016-HUD-033
9.T. (NF)  AUTHORIZATION TO AWARD THE TERMINAL 1 M&R AND GATE PROJECT
9.U. (NF)  AUTHORIZATION TO AWARD THE MARINE RESEARCH FACILITY BUILDING PROJECT
10. NEW BUSINESS
10.A. (MW)  APPROVAL OF A MEMORANDUM OF UNDERSTANDING BETWEEN THE MSPA AND THE NATIONAL PORT ADMINISTRATION OF CUBA
10.B. (JW)  APPROVAL OF TASK ORDER NO. 27 UNDER CONTRACT NO. 010-HUD-002 WITH THOMPSON ENGINEERING
10.C. (JW)  APPROVAL OF TASK ORDER NO. 17 UNDER CONTRACT NO. 010-HUD-003 WITH QES, INC.
10.D. (JW)  APPROVAL OF TASK ORDER NO. 21 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
10.E. (JW)  APPROVAL OF TASK ORDER NO. 24 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
10.F. (JW)  APPROVAL OF TASK ORDER NO. 25 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
10.G. (JW)  APPROVAL OF TASK ORDER NO. 9 UNDER CONTRACT NO. 010-HUD-010 WITH MICHAEL BAKER, JR., INC.
10.H. (NF)  APPROVAL OF TASK ORDER NO. 17 UNDER CONTRACT NO. 010-HUD-013 WITH ATWELL & GENT
10.I. (NF)  APPROVAL OF TASK ORDER NO. 5 WITH ELY GUILD HARDY UNDER CONTRACT NO. 016-HUD--31
11. PORT RESTORATION UPDATE  - NICK FOTO
12. OPERATIONS REPORT - MATTHEW WYPYSKI
13. EXECUTIVE DIRECTOR’S REPORT - JONATHAN DANIELS
14. GENERAL COUNSEL COMMENTS
15. MDA COMMENTS
16. COMMISSIONER COMMENTS
17.  EXECUTIVE SESSION - LEASE NEGOTIATIONS/POTENTIAL LITIGATION
18. ADJOURNMENT
Agenda Item Details Reload Your Meeting
Meeting: December 19, 2016 at 8:30 AM - Regular Commission Meeting
Subject:
1. CALL TO ORDER/QUORUM
Subject:
2. PLEDGE OF ALLEGIANCE
Subject:
3. INVOCATION
Subject:
4. ROTATION OF OFFICERS FOR CY 2017

            PRESIDENT                 ROBERT J. KNESAL
            VICE-PRESIDENT       JAMES C. SIMPSON, JR.
            SECRETARY               JOHN RESTER
            TREASURER               JACK NORRIS
            COMMISSIONER         E.J. ROBERTS
Description:
 
Subject:
5. PUBLIC COMMENTS
Subject:
6. APPROVAL OF MINUTES
Subject:
7. APPROVAL OF TRAVEL
Subject:
8. FINANCIAL REPORT - DEEDEE WOOD
Subject:
8.A. DISBURSEMENTS
Subject:
8.B. LICENSES
Subject:
8.C. PROGRESS PAYMENTS
Subject:
8.C.1. BALCH & BINGHAM,LLP/14-FD-08
Description:
GENERAL LEGAL SERVICES- $ 11,053.75
SOUTHERN INDUSTRIAL CONTRACTORS- $ 46,491.65
RESTORATION ACTIVITIES - $ 5,695.05
W.C. FORE TRUCKING APPEAL - $ 116.45
EUTAW BID PROTEST - $ 70.30

TOTAL BALCH & BINGHAM - $ 63,427.20
Subject:
8.C.2. BROWN, MITCHELL & ALEXANDER, INC./13-EN-02
Description:
GENERAL ENGINEERING - TASK 1 - $ 12,092.00
BULK HANDLING FACILITY - TASK 5 - $ 75,744.16
BERTH 7 DREDGING - TASK 6 - $ 9,381.50
BERTH 7 FENDER REPLACEMENT - TASK 8 - $ 1,977.50

TOTAL BMA - $ 99,195.16
Subject:
8.C.3. DOLEAC ELECTRIC CO., INC/15-EN-08
Description:
BULK HANDLING FACILITY - $ 166,058.10
Subject:
8.C.4. G.A. WEST & CO., INC./15-EN-03
Description:
BULK HANDLING FACILITY/CONVEYOR PACKAGE - $ 245,138.40
Subject:
8.C.5. MATTHEWS MARINE, INC./16-EN-04
Description:
BERTH 7 DREDGING - $ 114,391.45
Subject:
8.C.6. QES, INC./13-EN-03
Description:
BULK HANDLING FACILITY/MATERIAL TESTING - $ 7,105.00
Subject:
8.C.7. W.C. FORE TRUCKING, INC./15-EN-04
Description:
BULK HANDLING FACILITY - $ 418,277.68
Subject:
8.C.8. YATES ANDERSON JOINT VENTURE/14-EN-07
Description:
BULK HANDLING FACILITY/CM – $ 158,376.97
Subject:
8.C.9. ZPMC/15-EN-07
Description:
BULK HANDLING FACILITY/HOPPER PACKAGE - $ 96,000.00
Subject:
8.D. REQUESTS FOR CASH
Subject:
8.D.1. AUTHORIZATION TO RENUMBER PREVIOUSLY APPROVED REQUEST FOR CASH ITEMS:

       ORIGINAL RFC #152 TO RFC #159 (APPROVED 9/22/16)
       ORIGINAL RFC #153 TO RFC #152 (APPROVED 11/9/16)
       ORIGINAL RFC #154 TO RFC #153 (APPROVED 11/9/16)
       ORIGINAL RFC #155 TO RFC #154 (APPROVED 11/9/16)
Subject:
8.D.2. RESTORATION AGREEMENT RFC #155
Description:
CH2M HILL - $ 239,449.93
MICHAEL BAKER, JR - $ 12,529.96
NEEL SCHAFFER - $ 251,128.28
QUALITY ENGINEERING - $ 29,461.94
THOMPSON ENGINEERING - $ 12,981.26
VOLKERT - $ 1,671.80
YATES ANDERSON - $ 279,532.00

RESTORATION AGREEMENT RFC #155 - $ 826,755.17
Subject:
8.D.3. RESTORATION AGREEMENT RFC #156
Description:
YATES ANDERSON - $ 246,117.00
Subject:
8.D.4. RESTORATION AGREEMENT RFC #157
Description:
ANCHOR QEA - $ 98,096.37
ATKINS - $ 73,329.48
ATWELL & GENT - $ 90,718.78
DAN HENSARLING - $ 17,784.28
J.O. COLLINS - $ 494,353.92
L&A CONTRACTING - $ 1,534,279.90
MSPA - $ 73,382.36
RFB - $ 4,037.50
THOMPSON ENGINEERING - $ 1,210.12
WHARTON SMITH - $ 876,350.38

RESTORATION AGREEMENT RFC #157 SUBTOTAL - $ 3,263,543.09
Subject:
8.D.5. RESTORATION AGREEMENT RFC #158
Description:
NECAISE BROTHERS - $ 3,707,589.03
Subject:
8.E. FOR SEPARATE APPROVAL (FROM RFC#157):
Description:
ELY, GUILD, HARDY - $ 21,872.69

TOTAL REQUEST FOR CASH #157 - $ 3,285,415.78
Subject:
9. OLD BUSINESS
Subject:
9.A. (MW)  APPROVAL OF TERMINAL OPERATING AGREEMENT AND SPACE ASSIGNMENT WITH CROWLEY LINER SERVICES, INC.
Subject:
9.B. (JW)  APPROVAL OF MODIFICATION NO. 5 TO TASK ASSIGNMENT NO. 1 UNDER CONTRACT NO. 13-EN-02 WITH BROWN MITCHELL AND ALEXANDER
Subject:
9.C. (JW)  AUTHORIZATION TO AWARD THE DEMOLITION OF CHEMOURS STEEL SILO PACKAGE
Subject:
9.D. (JW)  APPROVAL OF CHANGE ORDER NO. 1 TO CONTRACT NO. 16-EN-04 WITH MATTHEWS MARINE, INC.
Subject:
9.E. (JW)  APPROVAL OF A NOTICE OF COMPLETION FOR CONTRACT NO. 16-EN-04 WITH MATTHEWS MARINE, INC. 
Subject:
9.F. (JW)  APPROVAL OF CONTRACT MODIFICATION NO. 3 TO CONTRACT NO. 14-EN-07 WITH YATES ANDERSON JOINT VENTURE
Subject:
9.G. (JW)  APPROVAL OF CONTRACT MODIFICATION NO. 1 TO CONTRACT NO. 15-EN-01 WITH PRISM SYSTEMS, INC.
Subject:
9.H. (NF)  APPROVAL OF AMENDMENT NO. 8 TO TASK ORDER NO. 22 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
Subject:
9.I. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 44 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
Subject:
9.J. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 45 WITH NEEL SCHAFFER UNDER CONTRACT NO. 010-HUD-001
Subject:
9.K. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 13 WITH VOLKERT, INC. UNDER CONTRACT NO. 010-HUD-007
Subject:
9.L. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 14 WITH VOLKERT, INC. UNDER CONTRACT NO. 010-HUD-007
Subject:
9.M. (JW)  APPROVAL OF AMENDMENT NO. 3 TO TASK ORDER NO. 13 WITH QEA, LLC. UNDER CONTRACT NO. 010-HUD-011
Subject:
9.N. (JW)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 8 WITH CDM SMITH UNDER CONTRACT NO. 010-HUD-012
Subject:
9.O. (NF)  APPROVAL OF AMENDMENTS THAT NEED AN EXTENSION OF TIME IN ORDER TO CLOSEOUT PROJECTS:

        #010-HUD-001 - NEEL SCHAFFER - AMENDMENT 4 TO TASK ORDER 30
                                    90 DAYS - CONSTRUCTION SERVICES FOR CRANE PROJECT
        
        #010-HUD-001 - NEEL SCHAFFER -  AMENDMENT 4 TO TASK ORDER 33
                                   164 DAYS - TERMINAL 3 M&R FACILITY ACTIVITIES

        #010-HUD-001 - NEEL SCHAFFER AMENDMENT 1 TO TASK ORDER 40 
                                   60 DAYS - TRUCK SCALE PROJECT @ GATE

        #010-HUD-013 - ATWELL & GENT - AMENDMENT 7 TO TASK ORDER 8
                                    181 DAYS - ELECTRICAL WORK IN PHASE 1
Subject:
9.P. (NF)  APPROVAL OF AMENDMENT NO. 1 TO TASK ORDER NO. 12 WITH ATWELL & GENT UNDER CONTRACT NO. 010-HUD-013
Subject:
9.Q. (NF)  APPROVAL OF CHANGE ORDER NO. 15 WITH L&A CONTRACTING UNDER CONTRACT NO. 013-HUD-018
Subject:
9.R. (NF)  APPROVAL OF CHANGE ORDER NO. 4 WITH NECAISE BROTHERS UNDER CONTRACT NO. 016-HUD-033
Subject:
9.S. (NF)  APPROVAL OF CHANGE ORDER NO. 5 WITH NECAISE BROTHERS UNDER CONTRACT NO. 016-HUD-033
Subject:
9.T. (NF)  AUTHORIZATION TO AWARD THE TERMINAL 1 M&R AND GATE PROJECT
Subject:
9.U. (NF)  AUTHORIZATION TO AWARD THE MARINE RESEARCH FACILITY BUILDING PROJECT
Subject:
10. NEW BUSINESS
Subject:
10.A. (MW)  APPROVAL OF A MEMORANDUM OF UNDERSTANDING BETWEEN THE MSPA AND THE NATIONAL PORT ADMINISTRATION OF CUBA
Subject:
10.B. (JW)  APPROVAL OF TASK ORDER NO. 27 UNDER CONTRACT NO. 010-HUD-002 WITH THOMPSON ENGINEERING
Subject:
10.C. (JW)  APPROVAL OF TASK ORDER NO. 17 UNDER CONTRACT NO. 010-HUD-003 WITH QES, INC.
Subject:
10.D. (JW)  APPROVAL OF TASK ORDER NO. 21 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
Subject:
10.E. (JW)  APPROVAL OF TASK ORDER NO. 24 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
Subject:
10.F. (JW)  APPROVAL OF TASK ORDER NO. 25 UNDER CONTRACT NO. 010-HUD-006 WITH YAJV
Subject:
10.G. (JW)  APPROVAL OF TASK ORDER NO. 9 UNDER CONTRACT NO. 010-HUD-010 WITH MICHAEL BAKER, JR., INC.
Subject:
10.H. (NF)  APPROVAL OF TASK ORDER NO. 17 UNDER CONTRACT NO. 010-HUD-013 WITH ATWELL & GENT
Subject:
10.I. (NF)  APPROVAL OF TASK ORDER NO. 5 WITH ELY GUILD HARDY UNDER CONTRACT NO. 016-HUD--31
Subject:
11. PORT RESTORATION UPDATE  - NICK FOTO
Subject:
12. OPERATIONS REPORT - MATTHEW WYPYSKI
Subject:
13. EXECUTIVE DIRECTOR’S REPORT - JONATHAN DANIELS
Subject:
14. GENERAL COUNSEL COMMENTS
Subject:
15. MDA COMMENTS
Subject:
16. COMMISSIONER COMMENTS
Subject:
17.  EXECUTIVE SESSION - LEASE NEGOTIATIONS/POTENTIAL LITIGATION
Subject:
18. ADJOURNMENT

Web Viewer