1. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
|
|
1.A. Fire/Security Alarm and Intercom System for Mission Junior High School Project – PBK Architects
|
|
1.A.1. Status Report
|
|
1.B. Mission High School (MHS) Phase III Renovation Project – PBK Architects
|
|
1.B.1. Status Report
|
|
1.B.2. Consideration and Approval of CPR#11 to “Credit” on Chase Finishes for the MHS Phase III Renovations Project
|
|
1.B.3. Discussion and Possible Action of CPR#16 for Tennis Courts Lighting Retrofit for the MHS Phase III Renovations Project
|
|
1.B.4. Consideration and Approval of CPR#17 for Electrical on Two (2) Ovens in the Kitchen Area for the MHS Phase III Renovations Project
|
|
1.B.5. Consideration and Approval of CPR#18 for Additional Shunt Trip Breaker in the Kitchen Area for the MHS Phase III Renovations Project
|
|
1.B.6. Consideration and Approval of CPR#24 for Removal of Existing 40 Linear Feet of PVC Pipe Under Chiller Pad Area for the MHS Phase III Renovations Project
|
|
1.B.7. Consideration and Approval of CPR#25 for Additional Extension Days Due to Delays from AEP for the MHS Phase III Renovations Project
|
|
1.B.8. Consideration and Approval of CPR#27 for Fourteen (14) Additional Weather Days for the MHS Phase III Renovations Project
|
|
1.C. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc.
|
|
1.C.1. Status Report
|
|
1.C.2. Consideration and Approval of Final Design and Construction Documents for the Tom Landry Stadium Renovations Project
|
|
1.D. School Marquees Project – Rick Hinojosa Structural Engineering
|
|
1.D.1. Status Report
|
|
1.D.2. Consideration and Approval for the Ranking of Proposals and Approval to Enter Into Negotiations with the Top-Ranked Firms in the Order of Selection for the School Marquees Project
|
|
1.E. MHS and Veterans Memorial High School (VMHS) Scoreboard Installation Project – Rick Hinojosa Structural Engineering
|
|
1.E.1. Status Report
|
|
1.F. Mission Junior High School Science Building Chiller Project – Halff Associate
|
|
1.F.1. Status Report
|
|
1.G. VMHS Tennis Court Lights and Canopy Project – Chanin Engineering
|
|
1.G.1. Status Report
|
|
1.H. New Student Drop-Off and Pick-Up Lane at Leal Elementary School Project
|
|
1.H.1. Status Report
|
|
1.I. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
|
|
2. INFORMATIONAL
|
|
2.A. Kari’s Law
|
|
2.B. Alton Christmas Parade
|
|
2.C. Special Education Classroom Cameras
|
|