September 6, 2017 at 6:30 PM - Facilities Committee
Agenda |
---|
I. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
|
I.1. School Marquees Project – Rick Hinojosa Structural Engineering
|
I.1.a. Status Report
Attachments:
(
)
|
I.1.b. Consideration and Approval of Final Completion, Less Betterment Fund Allowance and Final Payment, Less Liquidated Damages for the School Marquees Project
Attachments:
(
)
|
I.2. Mission High School (MHS) Phase III Renovation Project – PBK Architects
|
I.2.a. Status Report
|
I.2.b. Consideration and Approval of CPR #50 to “Credit” for Floor and Base Finishes for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.c. Consideration and Approval of CPR #54 to “Credit” for Plaster Ceiling for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.d. Consideration and Approval of CPR #60 for Cafeteria Furniture and Graphics for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.e. Consideration and Approval of CPR #61 to Fur Out all Overhead Doors in Kitchen Area for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.f. Consideration and Approval of CPR #62 to Clear Roof Drains at the Band Hall Area for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.g. Consideration and Approval of CPR #63 due to Unforeseen Utility at the West Side of the Fine Arts Building for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.2.h. Consideration and Approval of Change Order #02 for Sixty (60) Additional Delay Days for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.3. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc.
|
I.3.a. Status Report
Attachments:
(
)
|
I.3.b. Consideration and Approval of Additional Seven (7) Delay Days for AEA#11 for CPR #21 for the Tom Landry Stadium Renovations Project
Attachments:
(
)
|
I.4. Mission Junior High School Science Building Chiller Project – Halff Associates
|
I.4.a. Status Report
|
I.5. Veterans Memorial High School (VMHS)Tennis Court Lights and Canopy Project–Chanin Engineering
|
I.5.a. Status Report
Attachments:
(
)
|
I.6. North Side Swimming Pool Project – C. T. Brannon Engineering
|
I.6.a. Status Report
Attachments:
(
)
|
I.7. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
Attachments:
(
)
|
II. Others
|
II.1. MHS Tennis Courts Lights and Canopy – Mr. Roosevelt Rios
|
II.1.a. Status Report
|
II.2. 2017- 2018 HVAC and Lighting Commissioning for Projects
|
II.2.a. Consideration and Approval to Enter into Contract with DBR Engineering Consultants for the 2017- 2018 HVAC and Lighting Commissioning for Projects
Attachments:
(
)
|
II.3. Caliche Pad for the Transportation North Hub Project
Attachments:
(
)
|
II.3.a. Consideration and Approval of Proposal and Approval to Enter Into Contract with Javier Hinojosa, Civil Engineering for the Caliche Pad for the Transportation North Hub Project
|
II.4. Central Office Administration Project – EGV Architect
Attachments:
(
)
|
II.5. Consideration and Approval to Proceed with a New Design for the Central Office Administration Project Utilizing the same Design Team
|
II.6. Operations Facilities Project
|
II.6.a. Consideration and Approval of Project and Proposed Budget for the Operations Facilities Project
Attachments:
(
)
|
II.6.b. Consideration and Approval of Procurement Method, Selection Criteria, Review and Ranking Committee, Wage Rate, and Authorization to Seek Proposals/Bids for the Operations Facilities Project
Attachments:
(
)
|
II.6.c. Consideration and Approval to Request for Qualifications (RFQ’s) for the Selection of Architect/ Engineer for the Operations Facilities Project
Attachments:
(
)
|
III. Informational: Operations Division
|
III.1. Fixed Assets/Warehouse/Records/Textbooks Department
|
III.1.a. Approval to Declare Miscellaneous Items as Surplus and Authorize Disposal through On-Line Auction
Attachments:
(
)
|
IV. Adjournment
|