I. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
|
I.1. Mission High School (MHS) and veterans Memorial High School (VMHS) Scoreboard Installation Project – Rick Hinojosa Structural Engineering
|
I.1.a. Status Report
|
I.1.b. Consideration and Approval for Final Completion for the MHS and VMHS Scoreboard Installation Project
Attachments:
(
)
|
I.2. Fire/Security Alarm & Intercom System for Mission Junior High School (MJHS) Project – PBK Architects
|
I.2.a. Status Report
|
I.2.b. Consideration and Approval for Substantial Completion for the Fire/Security Alarm & Intercom System for MJHS Project
Attachments:
(
)
|
I.3. MJHS Building Chiller Project – Halff Associates
|
I.3.a. Status Report
|
I.3.b. Consideration and Approval of Construction Documents for the MJHS Science Building Chiller Project
Attachments:
(
)
|
I.4. MHS Phase III Renovation Project – PBK Architects
|
I.4.a. Status Report
|
I.4.b. Consideration and Approval of CPR#22R to Change Hardware Doors in Cafeteria Area for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.4.c. Consideration and Approval of CPR#29 for Parapet Roof Repair, Removal of Grease Trap and Additional Sewer Line for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.4.d. Consideration and Approval of CPR#32 for Unforeseen Structural Condition at the Band Hall for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.4.e. Consideration and Approval of CPR#34 to Replace All Existing Windows at Buildings M & N for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.4.f. Consideration and Approval of CPR#35 for Unforeseen Existing Roof Condition at Buildings M & N for the MHS Phase III Renovation Project
Attachments:
(
)
|
I.5. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc
|
I.5.a. Status Report
|
I.6. School Marquees Project – Rick Hinojosa Structural Engineering – Mr. Roosevelt Rios
|
I.6.a. Status Report
|
I.7. MHS and VMHS Tennis Court Lights and Canopy Project – Chanin Engineering - Mr. Roosevelt Rios
|
I.7.a. Status Report
|
I.8. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
Attachments:
(
)
|
II. INFORMATIONAL
|
II.1. North Side Swimming Pool Project - Update
|
II.2. Facility Needs Assessment Walk-thru in February 2017
|